KIK Energy team and solar installation

Solar infrastructure built in Bulgaria since 2011.

From a single site in 2011 to a portfolio of 14 operating solar power plants.

KIK Energy 1 Ltd was founded in 2011 in Sofia and builds and operates renewable energy plants, also trading the electricity they produce. Design and construction are carried out by our sister company, KIK Engineering Ltd — one team accountable for the full project lifecycle, from permitting to long-term operation.

Today we own and operate 14 photovoltaic power plants across the Yambol, Stara Zagora, Burgas and Plovdiv regions, with a combined installed capacity of 1,084.80 kWp and average annual production of over 1,148 MWh.

Our journey

Milestones

2011

Company founded

KIK Energy 1 Ltd registered in Sofia, Bulgaria, with a focus on renewable energy generation and trading.

2017 – 2019

First power plants commissioned

SPP Zemlen 1 and SPP Zemlen 2 in Radnevo municipality begin operation, our first steps as a plant operator.

2020 – 2022

Portfolio expansion

SPP Zvezdets and the nine SPP Krushevo plants are designed, built and commissioned in the Plovdiv and Burgas regions, alongside SPP Izgrev's first construction stage.

2023 – 2024

Larger-scale and storage-ready sites

SPP Krushevo 9 (241.98 kWp) and SPP Lozarevo (71.92 kWp) are commissioned, both featuring high-efficiency panels and integrated battery storage.

2025 – 2026

EU-funded battery storage project

Installation of a 0.2 MW / 0.466 MWh battery energy storage system at SPP Izgrev, co-financed by the European Union under the Recovery and Resilience Facility.

European project

EU-funded battery storage at SPP Izgrev

KIK Energy – 1 Ltd is implementing Project No. BG-RRP-4.032-0043 under the Recovery and Resilience Facility, adding a 0.2 MW / 0.466 MWh electrical energy storage system to our existing SPP Izgrev photovoltaic plant (0.3996 MWp).

The project is co-financed by the European Union through NextGenerationEU. Total investment value: BGN 233,700, of which grant funding covers BGN 116,850.

This publication has been produced with the financial support of the European Union – NextGenerationEU. The sole responsibility for its content lies with KIK Energy – 1 Ltd, and it does not necessarily reflect the official position of the European Union.

Battery energy storage system at SPP Izgrev