408.48 kWp
2022
Built in two stages; south-southwest orientation. A 233 kWh battery storage system was added in December 2025.
44.28 kWp
2018
South-southwest facing plant with a 15 kWh battery storage unit and full video surveillance.
36.90 kWp
2019
South-southwest facing plant connected via the local TP TKZS substation, with battery storage and CCTV.
31.00 kWp
2020
Combined ground and rooftop mounted panels, south-southwest orientation, with on-site CCTV.
31.28 kWp
2021
South-facing plant with a two-row galvanized mounting structure and CCTV site security.
31.28 kWp
2021
South-facing wing-type mounting structure, two-row arrangement, with video surveillance.
31.28 kWp
2021
South-facing two-row plant with galvanized vertical mounting profiles and CCTV.
31.28 kWp
2021
South-facing single-row installation with galvanized vertical mounting profiles and CCTV.
31.28 kWp
2021
South-facing single-row installation with CCTV site security, commissioned in September 2021.
31.28 kWp
2021
South-facing single-row installation with galvanized vertical mounting profiles and CCTV.
31.28 kWp
2021
South-facing single-row installation, commissioned December 2021 with full CCTV coverage.
31.28 kWp
2021
South-facing single-row installation, commissioned December 2021 with full CCTV coverage.
241.98 kWp
2023
East-west oriented plant with 8 inverters and 8 integrated LUNA2000 battery storage units.
71.92 kWp
2024
South-facing plant using high-efficiency bifacial panels, commissioned in February 2024.

Built in two stages with south-southwest orientation. In December 2025 a TIANWU battery storage system (233 kWh) was added, delivered under a project co-financed by the European Union through the Recovery and Resilience Facility.
Panels are mounted on a pre-assembled structure with 30° tilt, south orientation, made of hot-dip galvanized metal profiles.
Building permit: No. 72, Elhovo Municipality, dated 02.11.2021
Permit for usage — Stage 1: 28.03.2022
Permit for usage — Stage 2: 25.04.2025
View on Google Maps
South-southwest facing plant. Connected via a supply board from Elektrorazpredelenie Yug JSC, mounted on a low-voltage network pole.
Two-row metal structure of vertical galvanized profiles driven into the ground, with diagonal and longitudinal profiles. Site has CCTV video surveillance.
Building permit: No. 56, Radnevo Municipality, dated 12.12.2017
Permit for usage: 29.03.2018
View on Google Maps
South-southwest facing plant, connected through a supply board mounted on the facade of the TP TKZS substation in the village of Zemlen.
Two-row metal structure of vertical galvanized profiles driven into the ground. Site has CCTV video surveillance.
Building permit: No. 2, Radnevo Municipality, dated 31.01.2019
Permit for usage: 07.06.2019
View on Google Maps
Combined ground and rooftop installation with south-southwest orientation. 72 panels are mounted on a ground structure; the remaining 28 panels sit on a roof in 4 rows of 7, also portrait oriented.
Connected via a meter board of Elektrodistribution South EAD mounted on a low-voltage overhead network pole. Ground panels sit on a two-row galvanized metal structure. Site has CCTV video surveillance.
Building permit: No. ZV25, Malko Tarnovo Municipality, dated 17.06.2020
Commissioned: 10.08.2020
View on Google Maps
South-facing plant. The 68 panels are arranged in two rows of 34 modules connected in series.
Metal structure of galvanized vertical profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Building permit: No. 36, Parvomay Municipality, dated 09.04.2021
Grid connection contract: No. 443978, Elektrodistribution South EAD, dated 20.05.2021
EVN Bulgaria finding protocol: No. 443975, dated 05.07.2021
Commissioned: 05.07.2021
View on Google Maps
South-facing plant with a wing-type mounting structure in a two-row arrangement.
Wing-type metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Building permit: No. 60, Parvomay Municipality, dated 18.05.2021
Grid connection contract: No. 4452044, Elektrodistribution South EAD, dated 08.06.2021
EVN Bulgaria finding protocol: No. 4452044, dated 05.07.2021
Permit for usage: 05.07.2021
View on Google Maps
South-facing plant with a two-row mounting structure.
Two-row metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Building permit: No. 79, Parvomay Municipality, dated 11.06.2021
Grid connection contract: No. 4452044, Elektrodistribution South EAD, dated 12.03.2021
EVN Bulgaria finding protocol: No. 4461134, dated 05.07.2021
Permit for usage: 05.07.2021
View on Google Maps
South-facing plant with a single-row mounting structure.
Single-row metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Building permit: No. 78, Parvomay Municipality, dated 11.06.2021
Grid connection contract: No. 4457784, Elektrodistribution South EAD, dated 28.06.2021
EVN Bulgaria finding protocol: No. 4457784, dated 05.07.2021
Permit for usage: 05.07.2021
View on Google Maps
South-facing plant with a single-row mounting structure.
Single-row metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Grid connection contract: No. 4460922, Elektrodistribution South EAD, dated 31.05.2021
Completed construction application: No. 110, Parvomay Municipality, dated 04.08.2021
EVN Bulgaria finding protocol: No. 4470796, dated 17.09.2021
Permit for usage: 15.09.2021
View on Google Maps
South-facing plant with a single-row mounting structure.
Single-row metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Grid connection contract: No. 4458966, Elektrodistribution South EAD, dated 31.05.2021
Completed construction application: No. 9406801, dated 23.07.2021
Building permit: No. 109, Parvomay Municipality, dated 04.08.2021
EVN Bulgaria finding protocol: No. 4470794, dated 17.09.2021
Permit for usage: 15.09.2021
View on Google Maps
South-facing plant with a single-row mounting structure.
Single-row metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Building permit: No. 139, Parvomay Municipality, dated 18.10.2021
Grid connection contract: No. 4473403, Elektrodistribution South EAD, dated 19.11.2021
EVN Bulgaria finding protocol: No. 4473548, dated 23.12.2021
Permit for usage: 23.12.2021
View on Google Maps
South-facing plant with a single-row mounting structure.
Single-row metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Building permit: No. 140, Parvomay Municipality, dated 18.10.2021
Grid connection contract: No. 4473549, Elektrodistribution South EAD, dated 19.11.2021
EVN Bulgaria finding protocol: No. 4473549, dated 23.12.2021
Permit for usage: 23.12.2021
View on Google Maps
The largest plant in the Krushevo cluster, east-west oriented with integrated battery storage.
Metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Permit for usage: 15.06.2023
View on Google Maps
One of our newest plants, south facing, using high-efficiency bifacial panels.
Single-row metal structure of vertical galvanized profiles, with longitudinal support and diagonals. Site has CCTV video surveillance.
Permit for usage: 21.02.2024